Wednesday, March 12, 2014

Loops


So what does a guy who lives on board a boat do when its bucketing down with rain?  Well, read, write, cook, do the tax accounts (arrrgh!) or, he can make new dock lines.
I’ve five on this boat.  Bow, forward brace, forward spring, aft spring and aft brace.  The old ones were not in bad shape but were all refugees from other docks or boats, had to have knots  that in them and tying knots in 3/4in terylene three strand laid rope that is all full of salt and sun damage is not that easy, so its new docklines.

I bought a half roll of 15mm Polyester three strand laid rope, that’s about 150 ft of it, I only need about 1/3 of that but it was cheaper if I bought the lot and who knows, I might have to make a hangmans rope sometime.

Each dock line has a 10 tuck eye splice in each end, each splice with a whipping on each end, each whipping tarred with Stockholm tar.  About 25 minutes for each end of the line to make the splice, the whippings and the tarring.
Five lines, ten splices, 20 whippings and a whole lot of tar.
Just a bit over 4 hours for the lot.



I’ll make up a safety line for bow and stern as well, that comes from the outside of the boat away from the dock across to the dock, that’s for when the boat is going to be left for a while, insurance if you like.
I also need a line that is left permanently on the foredeck, it has enough length to come back just past the helm door in the main cabin and has a big loop so it can be dropped over a dock cleat when coming alongside, the helm then being put over while the engine is slow ahead which holds the boat alongside until the permanent docklines are  dropped over the bollards and cleats.


If they are all the right length with the right sized loops, it makes life a great deal easier, especially when handling the ship on your own.



So that’s what a man does on a rainy day.




Tuesday, March 4, 2014

Rainy day, but no blues apart from on the radio.


Another quick report on progress out in the workshop.

It’s a lousy day today, blowing hard and raining with it. We need it though, its been a very dry summer and this will kick off the grass and crop growth for the farmers and our vegetable gardens. While it’s nasty weather its not cold, about 24 deg c today and the forecast for tomorrow is good.   
One thing about New Zealand weather, if you don’t like it just wait for a few hours and it will be completely different.

So, rather than being out in the Kayak or whatever, I have been puttering around doing the minor woodwork on “ Scraps”. I’ve made up the oarlock blocks, epoxy coated the undersides of the skegs, painted the outside of the hull with primer, and filled a lot of the screw holes inside.
I am going to set this one up for lifting with davits or a boom tackle so it can be hoisted aboard easily,

so there is a little more woodwork to do than will be shown in the plans.
So for those who are interested, here are a couple of shots of “Scraps”.  6ft 3in long, about “that”  wide and weighing about as much as I can lift easily in one hand.
Yeh! I’ll have more accurate statistics later on.
In the meantime I’m looking forward to trying her out in a few days time.

Tool report, Fein Multimaster

 Nice case, plenty of room in it without being cumbersome.  Lots of space for tools, blades and various sandpapers etc. Secure clasps, good sized handles and a space for the service manual and parts list, just what you'd expect from a good quality manufacturer but so seldom actually get.


 
Tool report.                Fein MultiMaster

Very occasionally there comes a tool that has the potential to change the way you work, and think about the work.
I do a lot of close in detail work in my boatbuilding, and have for years wanted to treat myself to a really good multitool, one of those things that are descended from the saws that cut plaster casts from healed up broken limbs.
Fein were the first on the market with them, and since then there have been a number of similar machines from power tool companies.

A while back I bought an Ozito brand cordless one, mainly because I want to do a lot of detail sanding work on the outside of the ship prior to a repaint around the cabin windows and side doors, and do NOT want to be trailing an electric cord behind me with the boat afloat at its dock. That could be a shocking mistake!

The little Ozito,  cheap as it was to buy, has its limitations when it comes to anything other than  light sanding.  It does a fair job on that but has not the power to do much else, sawing and grinding, cutting tiles, plunge cutting with the narrow blade and so on are not really its forte.
But I have to say that its surprisingly good at sanding.
Ozito is the cheap “house” brand for Bunnings hardware which is one of Australia and New Zealands “Big Box Hardware” companies, and I have to admit that for very cheap tools they are not bad.
Do be aware that spares may take longer than you would like to get.

But the fact that the Ozito one performed pretty well as a sander working on small areas but not so well on the other functions really did point out to me that a good multitool would be a very useful addition to my tool kit.

So I went shopping, I’d a tiny bit of budget left for the workshop, and I figured that I might just about be able to scratch up enough to buy a midrange machine.

One of the things that I do to finance my boating habit is repair woodworking machinery, power tools among them which gives me a pretty good idea as to which are well designed and made and which are not. You’d be surprised at some of the things I find!  I know I am!

So, with a limited number of brands to choose from I went out to try some of them.
I wont go into what I found among some very prominent brands, I might find an unwelcome legal letter in my mailbox so had best not say too much about the ones I did not choose.
I will say though that a lot of the power tools you’ll find on display in most places are not suitable for continuous use such as a big job in a boat built or refurbishment. They are many of them DIY weight and if you are pushing them you’ll cook them or wear them out very quickly.

So I bought a Fein Multimaster FM250Q.  A serious professional grade tool.

The “Q” being for Quick action tool change. ( It’s the corded version by the way, more power and being the “shop” tool the cord and plug are not an issue.)

 There are cheaper choices, but this is the top of the range, superb to use, powerful, easy to change tools and it came not only with a heap of different tools including ceramic cutting blades ( yes I have a job coming up for those), sanding, sawing in several varieties, plunge cutting, and grinding.
The toolchanger is great, a lever on top, a very positive multi position locking mechanism and its very quick to use. Its changed the machine from one that is principally a single use unit that with some messing about you can fit another tool to one where swapping from one tool to another is about a 30 second task which requires no spanners or keys to facilitate.
This system does not seem to have the issues with tool security that the earlier models did.

Don’t likes? It’s a little heavy, but the way it fits my hand makes that bearable plus I think that the weight damps the relatively slight vibration.  Some sanders leave the operators hands tingling for a while after extended use but this is not one of them.
It’s a noisy darn thing, earmuffs!
I find that the on off switch is not that easy to use but then on the other hand its not going to be accidentally triggered when moving the hand to hold the machine at a different angle.

How good is it in use?  A multitool is not the tool for heavy use, it’s for fine detail and the areas into which you cant get your random orbital, your circular saw or your angle grinder. Its for the most part a finishing tool, and for that the Fein Multimaster  performs way beyond expectations.
I’ve used it for tasks that I am sure its makers would raise their eyebrows at, one was to grind hardened excess epoxy glue from overfilled seams and it did not flinch even when I had both hands leaning on it, I’ve cut plastic pipe, steel pipe, wallboard, fiberglass, solid and plywood, cleaned out glue, sanded inside tight curves and lifted ceramic tiles.  The tile cutting will come up soon and I am sure that it will perform there just as well as it has every other task I’ve thrown it at.
The variable speed is easy to dial up or down, and that makes quite a difference on some tasks.
Its changing the way I do things, I can cut where I could not, power sand where I had to do it by hand, chop off screws where I had to chisel them out (when the heads have stripped or twisted off) and I’m using it more and more.


Supplier, Roberson and Sinclair Ltd,  Hamilton branch. They’ll organise one over the phone and send it out to pretty much anywhere in NZ .  Talk to Andrew and tell him I said he’d do you a deal.

http://www.rands.co.nz   Click on the “Hamilton Branch” link.

It came in a really nice carry case with parts book, manual and user guide which was a bonus.

It’s a “10”. 

John Welsford






Sunday, February 23, 2014

Life on the river


23 02 14.

I was going to unhook the dock lines and head for Waiheke on this afternoons tide.  The morning started well, and I drove over to Silverdale to see what the “Wade River Festival” was all about.  While the people were all enthusiastic and the music that the two folk musicians were pumping out was nice, four tents and a half hour of haranguing by a group of maori who where supposedly giving a welcome speech was not going to hold me for long.
I did though sign up as a potential volunteer worker for a walkway that is being built from Silverdale down about a kilometre along the northern river bank .
The "Wade" river is the river on which I am moored, and Silverdale is the town at the navigable limit of the river, it was a nice place until suburbia caught up with it, a huge, sterile town center was built and the industrial area expanded.  There are patches of publicly owned land here and there, and the walkway project is one of several attempts to preserve that public land in a form that is attractive to use.

I got back to find that the forecast SouWesterly change had arrived, the ship surging around on her lines and the estuary white and streaky with what must have been close to 40 knots of wind ( The marine nowcast said Tiri channel weather bouy not far from the rivermouth was peaking at 38 knots) and I decided that I would be more comfortable here than out in the middle.

Consequently I am fitting the garboard planks to the little dinghy, will scribe and fit the topside planks this afternoon and expect to have the thing close to done by the end of the week.
When that’s done I’ll start on SEI (named after the small Whale species) as its both capable of voyaging around the gulf and rowing quite long distances so will suit the estuary.

 I've had several enquiries about this little boat, all going well plans will be ready soon.
I'll be putting the topsides planks on this afternoon and then it can be taped up.


I’ve painted up Dennys old plywood kayak, one that I built with her help more than 20 years back, and have twice now scrambled out of bed just before dawn on the right tide and headed up the river to watch the sun come up.  I managed to get my hands on a piece of carbon fibre tube the right length and diameter so have built a nice light paddle, makes things so much easier. Dawn when afloat so close to the water and sitting in a patch of native bush with the birds waking up is a very nice way to start the day.

The other job happening today is to scrape out and re putty a couple of the ships windows, they are most of them needing attention so with the warm wind to dry things out I’m doing a bit of prep work and will paint them soon.

While setting up the boatshed as a workshop I took advantage of a sale deal at Bunnings hardware,  they have a cheapo power tool house brand called “Ozito” and I’ve bought a cordless drill, a thickness planer, a power screwdriver, an angle grinder with sanding pad and a cordless multitool. That’s a little thing with a vibrating head that can take various blades or sanding heads, and I’m finding that the sander configuration is excellent for the small work inside the ship, so am just starting to get ready for a new coat of varnish in some of the sun struck areas inside.
Those amazingly cheap tools are some of them good, one or two very good and one or two terrible.  Dont buy the cordless screwdriver, its a waste of time and the 14.4 volt cordless drill is not brilliant, but the multitool is great and the other items work fine.

  The current plan here, apart from all the other plans, is to make a grid alongside the boatshed.  I figure that if I put a ladder down from the walkway along the side, I can get down there and excavate a patch down to something firm enough to stand on.  I’d need to take the fill away, so its going to be a couple of buckets full at a time into the wheelbarrow at the top of the ladder and wheel it along to the end of the seawall to dump. It will be out of sight there so I wont get a well meaning greenie asking if I have resource consent.
I don’t think that I’d need to go to the gym for a while, but it will give me a nice secure space for “May” where she can sit between tides.

 I didn’t get this sent yesterday,  got all involved with the little dinghy and then  found that it was suddenly time to meet someone.  So, back again.
It’s a near perfect day here on the river, 82 deg, gentle breeze, so for those of you who are stuck in the northern hemisphere winter here is a preview of your summer to come.  In the meantime I"m off out in the kayak.

 The view downstream from the boatshed.
Its about 4 miles down to the rivermouth, while the channels are narrow at low tide I'm ok above half tide.
The view from the upstream side of the boatshed across the river.
Yours
John



Wednesday, February 19, 2014

More about the boatshed.


If you’ve read the previous post that I put up a couple of hours ago you'll know I was complaining about the weather.  Its just stopped raining so I went and pulled the card from the camera and here is the next post , with pics.  Two in one day, wonders will never cease!

 Thats the shed from outside, about 40 ft x 14, thats 12m x 4m, about.
Nearest is what used to be shower and changing sheds for those swimming in the estuary, the family who built all this were serious about their recreation.

The boatshed is a slipway boatshed, designed to have a trolley on rails and a winch to haul a boat inside for maintenance or safekeeping.  But its been disused for quite a while, and while the building is ok the slipway rails are not, the trolley is not in the best of shape and the slipway winch needs a lot of work too.

I don’t need the slipway, my ship wont fit in there so I’d asked the landlord who kindly said yes when I proposed putting a floor in over the gap so I’d have a shop to work in. 

The shed splipway area looking out toward the water end, there is about a plywood sheet length from this end of the opening to the land end of the building.  I've just fought the reluctant trolley down the ways a bit to make some space, its an old road trailer with railway wheels bolted thereon. The wheels being rusted solid makes it hard to move. I hate to think what it weights. Someone said "Give me a long enough lever, and a fulcrum and I'll move the world!" Yeah, right!


So, bearing in mind that this floor has to be both removeable and very strong, I went hunting for bargains.
18mm CCA treated construction plywood came from 3 Brothers Hamilton, its downgrade.  A lot of it is forklift damage or dinged corners but as a regular there owner Trent did not mind me sorting through to get sheets where the damage was such that the sheets still suited my purpose.
Placemakers builders yard had 100x50 (four by two ) CCA ( exterior grade preservative) “fence rails” on special, so I sorted through those to get the clear lengths that I wanted, bought some hot galvanised flooring screws, joist hangers and such from the same place at trade rate ( thanks guys) and got started.

I borrowed a big wheeled automotive trolley jack (one with wheels on) and heaved the trolley up onto the rails then used a block and tackle (the wheels are rusted solid) to slide it back to the door leaving me a clear space 14 ft wide and 28 ft long.

Yes thats water, at high tide springs the floor is about 750mm (2 ft 6in) above the water.
The new part of the floor is two and a half sheets long, thats  eight and a half sheets of 18mm plywood, 14 lengths 5.2m ( about 16 ft) of lumber under it, plus 14 jackstuds down to the concrete underneath the rails. All screwed together ( about 300 x 50mm cs screws) so in 5 years I can pull it all out when I move again.
I can tell you that this caused some serious sweat, I'm not quite right yet so had to do this in achievable bites.  But its done!


The floor structure is supported by 100x100 posts, and a grid of joists and spans at close intervals across and along. The plywood is well screwed down, does not flex noticeably under load and the place feels very nice to work in.

I’ve built some shelves, one big cupboard with another to come, and brought in the machinery.

My elderly uncle was a joiner by occupation, and his home workshop included a bandsaw, little jointer, and a table saw. He’s 83 and not very interested in using them now, so I exchanged a few bucks for same and now have those set up and running.

Bunnings hardware had an “Ozito” brand  (its their cheapo house brand, more on this later) thickness planer there for $600, but the one on display was missing its box, manual, setting gauges, adjustment handle and cord.  It was the last one in stock so after some bargaining I left with it for $475. Brand new, never been used.
I have the cord sorted, already had a set of setting gauges, and the $26 replacement winder handle will be here in a day or two .
I got several other Ozito tools, but like I said, more on those later.

Next trip into the same place, sale price again I bought a Ryobi bench grinder with a linisher (sanding belt for metal but it handles wood just fine) on the end opposite the grinding wheel.  I need that for tool sharpening but the linisher is a wonderful addition to the shop capabilities.

I’ve still got a workshop in Hamilton, it has all this stuff, but if I have it at one end of my life, it wont be at the other end when I want to use it there so I’m setting up with cheap product here at the boatshed, and will do the heavy stuff at the other shop.  Just as well I drive a pickup.

I’ve begun building, as mentioned in the previous post, have the frames all stood up, transoms on and the bottom panel has just been slathered with glue and screwed into place.   As this is to be “a plan” (available in a couple of weeks) I am doing a trial build to get the corrected offsets for the panels, found a couple of errors so far but expect more as the panel offsets came from a 1/5 scale model and I don’t think that they are as good as my customers deserve.

Looking back from the water end into the shop. SCRAPS is taking shape, all frames and the transoms up, the seat forms the brace that holds it all together until the planking is on, and you can see some of the machinery and the workbench with vice at the back. 
Its a nice feeling space, fairly good light apart from over the bench at the back. I will be hanging an industrial flouro twin tube light over there and that should about do it. 
Oh yes, there is, if you look hard you can see it, a rollup door in the land end of the shed, so even if I cant get a boat out the little side door, and dont want to fuss with opening the locked doors at the water end I can still get a boat out.


As a by the way, I’m expecting this little boat to come in at about 60 lbs.

PS, I ran a hose down through the bush yesterday.  I had 90 metres of it and was about 2m short, but got more today and now have potable water at the boatshed and across to the ship so I don’t need to motor for an hour each way to fill the tanks.  Real progress, with that done showers can be as long and as luxurious as I want.
I’m filling the 800 litre tankage up as I write. Hear that gurgling? It’s the sound of progress.

JW

Tuesday, February 18, 2014

Back boatbuilding again.

Just a quick post today, no pics as its raining and my camera is up in the boatshed.
 I have almost completed setting up the boatshed as a workshop, have a temporary plywood floor built over the slipway ( which is too small for my ship so I cant use it anyway) and am busy building the prototype of a little dinghy for the sloop.  The last one worked,  but the constraints of fitting it into the cockpit of the sloop meant that it was just a little too small, 5ft 6in is a very small dinghy and I'd been having issues with low blood pressure causing poor balance so needed a little more stability.  Annie Hill ( the "Voyaging on a Small Income" book lady) bought it, and she's petite to be polite, fits the little boat perfectly and can lift it up on the deck of her liveaboard junk rigged 26 footer without any trouble.
The shape worked well, and in fact in spite of its tiny size the wee thing was better than you'd expect but now I drive a pickup truck I can carry a bigger dink in the tray on the back while towing the sloop on its trailer, so the new one will be a little longer and a little wider.
Watch this space.

JW

Monday, December 30, 2013

Its almost 2014, New Years eve this evening, about 9 hours to go.
This year has been a horrorshow, with a few exceptions, just enough to keep me sane ( but thats a matter of opinion, mostly mine!).
But the next year is shaping up better, I'm in much better shape, I've two SCAMP Camps plus the Academy sailing skills courses to teach, a third one here in New Zealand, plus the chance of more teaching about design.  I'm working hard to be fit enough to cope, not like last time where I had to creep away for naps and meds to get through the day.

I'm part of the time resident on my ship Kairos, and thats working out nicely, have done a bit of cruising in her, some with family aboard and some with friends Maureen and Jamie Orr from Victoria on Vancouver Island.

It was nice cruising, and the ship is proving to be both comfortable and reliable, perhaps some work to do on damping out the clatter from the big Ford diesel, and there is quite a bit of deferred maintenance in terms of paintwork to catch up on, but its nothing major.
I've run about 400 litres of diesel through the engine so far, thats about 50 hours of running and its not smoking like it was, starts instantly now, and its initial problems seem to have simply been caused by being too often run sitting in the marina with no load on.
As a by the way, I got a 12 m marina berth in Marsden Marina as part of the deal, its got 3 years to go on the lease and I'd be please to sell it, very cheap if anyone is interested.

While out with the Orrs, Jamie got me to drop him in the dinghy way out in the middle of the passage between Rakino and Whangaparoa, and run back and forth to get some photographs of her under way.
Heres a nice shot, we're running at about 8 knots , if you could see me behind the starboard side windscreen in the main cabin you'd see a big smile.




So from me here on New Years Eve, all the very best to everyone for 2014, its going to be a good year!

John Welsford

Stillwater
Auckland
New Zealand